FPSO Anna Nery

Jord Oil & Gas systems bv is awarded by Yinson Production to provide Engineering, Procurement and Construction of 5 topside modules for has FPSO Anna Nery (“FPSO”) which will be installed at Marlim and Voador Field, offshore Brazil.

Simu Engineers bv is providing complete structural engineering service for JORD and construction follow-ups. The total scope of work is approximately 7000mT for separation module, produced water treatment module, 2 x power generation module and closed drain module.

The total amount of man hours for structural engineering is approximately 16,000 man hours. The engineering deliverables include in-place analysis, transport analysis, blast analysis, fatigue analysis and fire redundancy analysis. Drawing packages include 3D modelling, Primary steel drawings, Secondary steel drawings, tertiary steel drawings and temporary structure drawings.

Documentations are approved by DNV and Client.