FPSO BP Tortue
Project: FPSO BP Tortue
Client: TechnipFMC
Year: 2019
Simu Engineers Services:
• 3D modelling
• Structural Design
• Structural Analysis
• Weight controls
• Drawings
TechnipFMC is awarded by BP to provide an gas pretreatment FPSO for its Greater Tortue Ahmeyim Phase Development in Mauritania and Segegal. TechnipFMC Rotterdam office is responsible for structural engineering of 2 topside modules:
- ME01 Flash Gas Compression
- MW02 Gas Dewpointing / MEG & Methanol Injection / Fuel Gas
Simu Engineers bv is supporting structural engineering service for TechnipFMC Rotterdam office during during the EPC phase for 3 modules. ME01 has a weight of approximately 1700mT and MW02 has a weight of approximately 3200mT.
The engineering deliverables include in-place analysis, transport analysis, blast analysis, fatigue analysis and fire redundancy analysis. Drawing packages include 3D modelling, Primary steel drawings, Secondary steel drawings, tertiary steel drawings and temporary structure drawings.